ECR NEWS

Tandil, Buenos Aires, August 2018

Photovoltaic Solar Plant (PSP).

ECR Solar, develops a project of Photovoltaic Solar Plant (PSP) of 100 kW in the city of Tandil, the conversations with the interested company or commissioner, are very advanced, being a bet to the energy saving, reduction of the CO2 emissions and Greenhouse Gases (GG). Once again, ECR Solar continues to demonstrate why it is the leading company in Renewable Energy in Tandil and one of the leading companies in the entire Argentine Republic.

Tandil, Buenos Aires, July 2018

ECR Solar, Tandil, Buenos Aires, Argentina.

The company ECR Solar, has designed and installed an Isolated Solar System (Off Grid), in the YPF Service Station, the most important in the town of Tandil in the province of Buenos Aires. The solar system is an isolated system composed of an autonomous solar street lamp and photovoltaic modules mounted in geo-seasonal structure, on a large energy cabinet, these renewable energy equipment, will provide permanent lighting and generate energy savings.

Buenos Aires, July 2018

ECR Solar, Buenos Aires, Argentina.

The company ECR Solar, has established itself as a developer of Photovoltaic Solar Plant (PSF) Projects, product of the Projects presented to several companies and energy Cooperatives.

Azul, Buenos Aires, January 2018

Azul, Buenos Aires, Argentina.

The company ECR Solar, has designed and installed an Isolated Solar System (Off Grid), in a ranch in the town of Azul in the province of Buenos Aires

Rosario, Santa Fe, December 2017

Full Power Ahead, Rosario, Santa Fe, Argentina.

The company ECR Solar, has presented a Project of Photovoltaic Solar Plant (PSF) of 750 kW, to the Secretariat of Renewable Energies of the Province of Santa Fe. This Project was requested by the company Full Power Ahead of Rosario.

Olavarría, Buenos Aires, Septiembre 2017

UNICEN, ECR Solar and Coopelectric, PSF in Espiga, Olavarría, Bs. As. Argentina.

ECR Solar staff, together with authorities of the Engineering Faculty of the University of UNICEN Center and personnel of the Coopelectric company, visited the 200 kW Photovoltaic Solar Plant (PSF), located in Espigas, Olavarría, province of Buenos Aires.

Tandil, Buenos Aires, August 2017

Laboratory for Veterinary Diagnosis, Tandil, Argentina.

The company ECR Solar, is the 1st private company in Tandil and one of the first in Argentina, to install solar equipment with grid connection. Consequently, The Laboratory for Veterinary Diagnosis, by Dr. Claudia González, is located at Gral. Rodríguez Street 1307, in the city of Tandil and is the first laboratory with photovoltaic solar energy with a grid connection.

C.A.B.A., Buenos Aires, June 2017

Embassy of Italy in Buenos Aires, Argentina.

Personalities from all walks of life gathered at the Italian Embassy to celebrate June 2; day that the European country celebrates the creation of its Republic. Together with Mrs. Ambassador Teresa Castaldo, national and foreign authorities, the President of ECR Solar, arch. Enrique César Rodríguez, was present at the Embassy of Italy, in Buenos Aires, on the occasion of the celebration of Republic Day.

Tandil, Buenos Aires, November 2016

USINA POPULAR TANDIL, Argentina.

The company ECR Solar, was awarded the first tender for the sale of equipment that has presented the USINA POPULAR TANDIL and the Municipality of Tandil, for the first 6 kindergartens of the Municipality. The equipment was supplied as follows: Photovoltaic solar modules, Regulators for connection to the grid and other equipment.

Beijing, Abril 2015

China Aerospace 2015, Beijing, China.

The President of ECR Solar, architect Cesar Enrique Rodriguez, was invited by the Vice President of China Aerospace. The meeting was in the main building of the Chinese company, prior to the signing of agreements between both companies. At the meeting the President of ECR Solar received a present from the Vice President of China Aerospace, Professor Yu Bin.

Beijing, April 2015

China Aerospace 2015, Beijing, China.

The President of ECR Solar, architect Enrique César Rodriguez, visited the facilities of China Aerospace, invited by the Vice President, professor Yu Bin of China Aerospace. He made important visits to works of the Chinese company and held important meetings on cooperation agreements.

Seoul, April 2015

ICLEI World Congress 2015, Seoul, South Korea.

The architect Enrique Cesar Rodriguez, KOTRA has been invited to participate ICLEI World Congress 2015 in Seoul, South Korea, for the month of April. ECR Solar, present a building project with bioclimatic architecture and renewable energy.

Read more

Busan, March 2015

Korea LAC 2015, Busan, South Korea.

The architect Enrique César Rodríguez, has been invited by IDB, to attend the Congress Korea LAC 2015 in the city of Busan, South Korea, for the month of March. ECR Solar, present a building project with bioclimatic architecture and renewable energy.

Hong Kong, October 2014

ElectronicAsia 2014, Hong Kong, China.

The President of ECR Solar, has been invited by the Consulate of Hong Kong, to participate in the Electronics Fair in Hong Kong and providing a conference on renewable energy projects and electric vehicles produced by ECR Solar in China. It was held at the Hong Kong Convention and Exhibition Centre in Hong Kong, from 13 to 16 October.

Changsha, September 2014

LAC Business Forum 2014, Changsha, China.

The architect Cesar Enrique Rodriguez, President of ECR Solar, has been invited by the IDB. Had an active participation in China LAC 2014, with important projects presented.

ECR Solar, through of the President, architect Enrique C. Rodriguez, presented material, jobs, national and international projects, plus books and materials from Argentina. Chinese and Argentine authorities were present at the Forum and met with the President of ECR Solar, Enrique César Rodriguez, during his stay in Changsha city.

Spain, May 2014

Solar Thermal plants

During the month of May, the President of ECR Solar, arch. Enrique César Rodríguez, conducted courses and visited 2 solar plants in Spain: ANDASOL 3 in the city of Granada and Almería Solar Platform. Consequently, ECR Solar is the 1st company specialized in Argentina Solar Thermal Plants with parabolic trough technology.

Incheon, April 2013

GGHK 2013 – GCC-KOLAC, Incheon , South Korea.

The architect Enrique César Rodríguez, President of ECR Solar, has been invited by KOTRA, the commercial office of the Embassy of South Korea. Participation was for GGHK 2013, in Incheon, South Korea. The architect Enrique César Rodríguez, attended the 4th International Conference in Incheon, GCC- Kolac (Green Convergence Center - Korea and Latin America and Caribbean). The conference was provided by the professional about: ¨ The State of Argentina Renewable Energies Industry¨.

Buenos Aires, April 2012

Energy cabinet in Molinos Río de la Plata

ECR Solar installed an energy cabinet in Molinos Río de la Plata. ECR Solar, designed and manufactured the new independent solar lighting system, which has the following components:

• Energy Cabinet.

• Photovoltaic solar modules.

• Stationary battery.

• Charge controller and connections.

• LED lamp with existing column.

This is a pilot, which is looking to make more additions in the same area of San Fernando, Buenos Aires. It´s important to note that all components are of national industry.

Tandil, March 2012

Project to build a Photovoltaic Solar Plant

ECR Solar, is studying a project to build a Photovoltaic Solar Plant of about 20MW. The idea is to build in some of the excellent heliophany provinces of Argentina. This involves a comprehensive process for the development of photovoltaic technology and integration of photovoltaic modules to generate sustainable electricity in the Argentine market. This project will generate benefits, including:

• Movilización económica regional.

• Regional economic mobilization.

• Development of local technology.

• Creation of new jobs.

• Generation of electricity.

• Improvement of the Environment.

• Reduce emissions of greenhouse gases to the atmosphere.

• Networking.

• Injection Wholesale Electricity Market.

As for the Photovoltaic Solar Plant; are some details and specifications on the following points:

• The plant includes 2-axis solar trackers or fixed structures and supports, with seasonal adjustment of photovoltaic modules.

• The estimated annual energy for this plant would be estimated at 36,600 MWh.

• Energy for about 16,600 homes approximate average consumption.

• Intensity of solar radiation incident on horizontal surface up to about 7.5 kWh / m² / day.

• Heliophany effective or just hours of sun, between 5 and 9 hours daily, depending on time of year and also the area or region of the province to intervene.

• The price for a 20 MW plant is estimated at a minimum of $ s 0.29 / kWh delivered.

• Investment capital and unprecedented in the country and throughout Latin America.

• The area required for such plants is estimated at least 130 hectares.

Rosario, Februay 2012

ECR Solar, convener entity SUSTAINABLE INTERNATIONAL FORUM - Rosario 2012

ECR Solar, has been invited to participate as convener entity SUSTAINABLE INTERNATIONAL FORUM - Rosario 2012. The Forum is an initiative of the Municipality of Rosario, which shares the challenge of building a democratic, participatory and diverse with hundreds of local governments, state agencies, civil society organizations, academic and research organizations, companies and organizations, international organizations, among others. Its objectives are:

• Establish a reference point between the local, national and international to the Earth Summit of Rio +20.

• Share and build proposals, among the various sectors, alternatives to new economies more just, inclusive and sustainable.

• Rethink and propose a new vision of local and global governance.

• Promote a process of dissemination, integration and intercultural and inter-generational involvement in the issues that make an ethics for the sustainability of our societies.

Starts on 22 April (World Earth Day), with a great cultural event in the area of the Monument to the flag, which stands installed participating organizations who will discuss the ecological food, renewable energy, organic gardeners, etc. In the evening will close with a recital of bands will issues related to the concept of sustainability. Over the next two days, will be held simultaneously in different parts of the city (faculties, schools, meeting rooms, public and private, neighborhood, youth shed, etc.). Workshops, conferences, presentations, meetings arranged themes, and presented by those who register and are accepted by a committee composed of individuals with expertise in the problem.

Seoul, October 2011

LAC Business Forum 2011, Seoul.

The architect Cesar Enrique Rodriguez, President of ECR Solar, has been invited by the IDB and KOTRA, commercial office of the Embassy of South Korea. Participation was for Korea - LAC Business Forum 2011 in Seoul, South Korea. A Day of Training in the KOTRA building - Seoul and the conference business at the Shilla Hotel in Seoul.

ECR Solar, through the arch. Enrique C. Rodriguez, presented material, jobs, national and international projects, plus books and materials from Argentina. Korean and Argentine authorities were present at the Forum and met with the arch. EnriqueC. Rodriguez, during his stay in Seoul.